Case Study – Network Rail

The new rail depot at Edge Hill, Liverpool required a large surface water pumping station in addition to the foul water pumping station. The Integrapump was the ideal solution for the limited space available, providing a large storage capacity at a deep burial depth and preventing the need for an additional excavation for the separate valve chamber – ongoing clean ease of maintenance with no confined space requirement thus limiting Health and Safety issues.

Network Rail

Image of rail station at night.

The Integrapump®

The Integrapump® (Patent no. GB2447308) – Exclusive design of a one piece station incorporating a separate valve chamber as an integral part of the tank especially suited to meet the requirements of water boards and utilities.

Control panel

Control panel.

Previous page

  • Previous page
  • Request a quote
  • Request commissioning
  • Request a call back
  • View the download library
  • WRc Approval